Search
Close this search box

Acta Marine takes delivery of Acta Pegasus

Acta Marine has received its fourth W2W vessel, Acta Pegasus, a DP2 CSOV set to operate from Montoir-de-Bretagne under the French flag. The newbuild offers 135-person capacity and motion-compensated access gear.
Photo source: Acta Marine

SHARE ARTICLE

Acta Marine has taken delivery of Acta Pegasus, its fourth walk-to-work unit and a DP2 construction service operation vessel (CSOV). The vessel is the first in a four-ship newbuild programme and is set to work from Montoir-de-Bretagne under the French flag, supporting offshore wind projects in France.

The newbuild is part of a quartet being built for Acta Marine at Tersan Shipyard in Turkey. Acta Pegasus is arranged for up to 135 persons in 88 cabins and is fitted with offshore access and lifting systems, including a 3D motion-compensated gangway and a 3D-compensated crane.

The company said the vessel is prepared for methanol use and features dual-fuel capability aimed at lower-emission operations. CEO Rob Boer said the vessel is being mobilised and final preparations are underway ahead of its first assignment.

On the wider series, Acta Marine said sister vessel Acta Hercules is under construction and is due to enter service in the first quarter of 2026. Acta Gemini and Acta Aquarius are scheduled to follow in the second quarter of 2026.

Acta Pegasus is built on Ulstein’s twin X-STERN hull design, which is described as reducing pitching and improving operability in-field, with high DP capability for demanding conditions. The vessel’s dual-fuel engines can run on marine gas oil or a marine gas oil–methanol blend and are supported by substantial battery capacity. For lifting work, the SMST 3D motion-compensated crane is rated at 6 t at full compensation. The gangway supports walk-to-work transfers in wave heights up to 3.0 m and includes an integrated elevator for personnel and cargo movement. Amenities listed include a restaurant, multifunctional lounges, sauna, gym, and smart Wi-Fi connectivity.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Smulders has loaded two offshore substation jackets for the Bałtyk 2 and Bałtyk 3 wind projects onto barges at its Newcastle yard for transport to the Polish Baltic Sea.
Vestas and EnBW are investigating a blade failure involving a V236-15 turbine at the 960MW He Dreiht offshore wind farm. No injuries occurred, and the site was secured.
BW Ideol and NGE will jointly develop the Fos3F concrete floating foundation factory at Fos-sur-Mer, targeting annual production of around 30 units for the Mediterranean market.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com