Search
Close this search box

Mammoet Loads Out 6,892t Jacket for Neptun Deep Project

Mammoet has loaded out a 6,892t jacket for Saipem at Arbatax, Sardinia, using 300 axle lines of SPMTs to transfer the structure onto the Castoro XI barge for the Neptun Deep project.
Image source: Mammoet

SHARE ARTICLE

Mammoet has completed the load-out of a 6,892t jacket for Saipem at its facility in Arbatax, Sardinia.

The operation used 300 axle lines of SPMTs to move the structure from the quayside onto the Castoro XI barge.

The jacket will be installed offshore as part of the Neptun Deep Gas Development Project in the Black Sea, Romania.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
GPO Emerald departed Karimun, Indonesia, carrying a topside for the Neptun Deep gas field in Romania’s Black Sea sector. The voyage around the Cape is expected to take about 45 to 47 days.
Saipem is preparing JSD6000 in Genoa for subsea installation work on the €4 billion Neptun Deep gas project in the Black Sea.
Mammoet helped remove the 2,300 tonne US 181 Harbor Bridge center span in Corpus Christi by lowering it onto a barge in one piece.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com