Search
Close this search box

Mammoet

Mammoet Completes Heather and Eider Alpha Load-Ins

Mammoet supported Allseas in the 2025 load-in of the Heather Alpha and Eider Alpha topsides, completing both floating operations in a single shift after integrated preparation of Iron Lady for the two structures.

Zr.Ms. Holland Moves Into Royal IHC Hall for Upgrade Phase

The Zr.Ms. Holland has been moved into the Royal IHC hall in Krimpen aan den IJssel following a multi-step tow, float-on and roll-off sequence using HEBO-SUB1 with final support from Mammoet. The move begins the vessel’s midlife upgrade.

Harbor Bridge Truss Removed in Corpus Christi

Mammoet removed the 2,300t truss of the US 181 Harbor Bridge in Corpus Christi for TxDOT and FlatironDragados. The structure was lowered 50 meters, loaded onto a barge, and moved using 108 axle lines of SPMT.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com