Search
Close this search box

Boskalis’ Blue Marlin Transports Massive Floating Production Unit to Angola

Boskalis’ semi-submersible vessel Blue Marlin is transporting a 41,000-ton Floating Production Unit from China to Angola for Congo’s first natural gas liquefaction project, showcasing the company’s offshore heavy transport expertise.
Boskalis Blue Marlin carrying a 41,000-ton Floating Production Unit en route to Angola for Congo LNG project
Image shows Boskalis’ Blue Marlin transporting a 41,000-ton FPU, (Image courtesy of Boskalis via LindedIn)

SHARE ARTICLE

Boskalis’ semi-submersible heavy transport vessel Blue Marlin is en route to Angola carrying a colossal 41,000-ton Floating Production Unit (FPU), one of the most significant offshore cargoes transported this year.

The cargo, originally built as one of the world’s largest semi-submersible drilling rigs, has been converted into a modern FPU to serve in Congo’s first natural gas liquefaction project. Measuring 80 by 68 meters, the unit is notably wider than Blue Marlin’s 63-meter deck, yet it has been secured firmly for the transoceanic voyage.

According to ship tracking data, Blue Marlin departed Yantai, China, on August 27, 2025, and is scheduled to arrive in Angola on October 26, 2025, where the FPU will be discharged. The transport highlights Boskalis’ expertise in handling ultra-heavy offshore units and its ability to accommodate cargo dimensions that exceed vessel deck limits.

The company extended its best wishes to the crew, emphasizing the strategic role this delivery will play in strengthening Congo’s offshore energy infrastructure. The FPU is expected to be central to the region’s emerging natural gas export capabilities.

Loading operation of the 41,000-ton Floating Production Unit onto Boskalis’ semi-submersible vessel Blue Marlin (Image courtesy of Boskalis)
Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Boskalis has started sand replenishment at Galgeplaat and Slikken van den Dortsman, using Freeway to support habitat restoration in the Eastern Scheldt. Completion is expected in late March 2027.
Boskalis has reported 570,000 tonnes of subsea rock installed for Aker BP's Skarv Satellite Project in Norway, with Rockpiper involved in offshore operations and challenging rock-loading conditions.
Boskalis' semi-submersible vessel Forte has delivered SpaceX's recovered Starship Ship 40 to Brownsville, Texas, after a 12,729-nautical-mile voyage involving float-on loading near Christmas Island.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com