
Topside Transported by GPO Emerald Installed at Neptun Deep
The Neptun Alpha topside transported from Indonesia by GPO Emerald has been installed offshore for the Neptun Deep gas project in Romania’s Black Sea.

The Neptun Alpha topside transported from Indonesia by GPO Emerald has been installed offshore for the Neptun Deep gas project in Romania’s Black Sea.

Mammoet is moving 122 m, 2,473 t offshore wind monopiles at Port of Argentia using a custom transport system developed for large-diameter foundations.

TWD has completed seafastening grillage designs for transporting Fengmiao I offshore wind jackets from Korea to Taiwan in its first collaboration with SK Oceanplant.

Sarens is preparing 560 SPMT axle lines and 24 PPUs for the July 2026 load-out of the 17,666 t Valhall PWP topside in Stord after module operations across Norway.

Sanctioned heavy-lift vessels Glory Ocean and Bright Ocean have delivered TMR-001 and TMR-002 modules to Novatek’s Belokamenka yard for the Arctic LNG 2 project.

BBC Genoa completed the first full Seaway transit by a LakerMax vessel, followed by BBC Kolding’s maiden-voyage arrival at the Port of Duluth-Superior.

The Perdaman logistics campaign has completed its 100th module loadout at Kattupalli, with 20 voyages finished and the 21st now in progress to Karratha.

BOABARGE 38 has arrived in Chioggia to load two 800-tonne Goliath cranes built by Cimolai Technology for sea transport to Fincantieri’s Monfalcone shipyard.

Jumbo Offshore and CoreMarine are providing integrated SSY transport and installation services, including FLNG mooring work for Hilli Episeyo and MKII FLNGs in Argentina.
For general inquiries and to contact us,
please email: info@hmt-news.com