Search
Close this search box

Dajin Delivers KING THREE, Completing Three-Vessel KING Fleet

Dajin Heavy Industry has delivered KING THREE, completing its three-vessel KING heavy deck carrier fleet as construction progresses on the larger EMPEROR series.
Photo: Dajin Heavy Industry

SHARE ARTICLE

Dajin Heavy Industry has delivered KING THREE, completing its three-vessel KING series of large deck carriers and establishing the company’s self-owned ocean-going transport fleet.

KING THREE, the third vessel in the series, was officially delivered on 27 September 2026 at Dajin’s Panjin base in China. KING ONE and KING TWO had already been delivered, with KING TWO beginning its maiden voyage on 2 September carrying monopiles for the BC Wind offshore wind project.

The KING-series vessels measure 239.8 m in length and 51 m in breadth, with a deck working area of 12,000 m² and a maximum deadweight of 40,000 tonnes. They have a maximum speed of 13 knots and a range of up to 16,000 nautical miles, and are designed to transport large offshore wind equipment including monopiles and jackets.

KING ONE began its maiden voyage in February 2026 and subsequently completed two voyages carrying monopiles to European ports. Dajin’s 2026 interim report had scheduled KING THREE for September delivery and targeted full operation of all three KING-series vessels during the year.

Dajin is also progressing construction of its larger EMPEROR series of ultra-wide heavy-load deck carriers. The new design measures 245 m in length and 61 m in breadth, with a deck area of 13,500 m² and a maximum deadweight of 60,000 tonnes.

The EMPEROR series is equipped with twin-engine, twin-propeller propulsion and six 3,000 m³/h ballast pumps. Dajin lists floating foundations, oil and gas modules and other ultra-large equipment among the cargoes targeted by the design. The company said in its interim report that construction of the series was progressing.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Chipolbrok has started construction of TK2601, the first of six 60,800-dwt multipurpose heavy-lift vessels, following steel cutting at Taizhou Kouan Shipbuilding.
COSCO Shipping Specialized is adding 14 60,000 DWT multipurpose heavy-lift vessels through eight newbuildings at Dalian COSCO Shipping Heavy Industry and six long-term bareboat charters.
Mumbai Port Authority handled three ODC packages weighing a combined 1,452 t using a specialised barge roll-off operation for onward shipment to Abu Dhabi.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com