Search
Close this search box

GustoMSC Targets Higher Offshore Wind Jacking Capacity

GustoMSC has introduced ASYM R&P technology to raise offshore wind installation vessel jacking capacity without increasing vessel size, weight, or system complexity.
Image source: GustoMSC

SHARE ARTICLE

GustoMSC has introduced a patent-pending asymmetrical rack & pinion technology designed to increase the jacking capacity of offshore wind installation vessels without making the vessel larger or adding system weight and complexity.

The ASYM R&P technology comes as offshore wind turbines continue to grow in size. Larger turbine components are placing higher load demands on installation vessels, while project teams are still expected to maintain efficient operations and delivery schedules.

According to GustoMSC, NOV’s offshore design and engineering business, the new system builds on its experience in rack & pinion jacking technology. The design changes how loads are distributed across the existing jacking arrangement, allowing more effective use of structural capacity within the same vessel footprint.

Rather than using bigger components to achieve higher performance, the technology applies an asymmetrical layout within GustoMSC’s established rack & pinion systems and jack-up vessel designs. The company said this approach allows installation vessels to handle higher load requirements without moving toward heavier or more complex equipment.

The development is aimed at future offshore wind projects in deeper waters and more demanding operating areas. As turbine capacities increase, installation vessels will need to manage larger components while keeping systems efficient and straightforward to operate.

GustoMSC said ASYM R&P technology supports that requirement by improving capacity within the current system architecture. The technology also reflects NOV’s focus on practical engineering solutions for the next stage of offshore wind installation.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Smulders has loaded two offshore substation jackets for the Bałtyk 2 and Bałtyk 3 wind projects onto barges at its Newcastle yard for transport to the Polish Baltic Sea.
Vestas and EnBW are investigating a blade failure involving a V236-15 turbine at the 960MW He Dreiht offshore wind farm. No injuries occurred, and the site was secured.
BW Ideol and NGE will jointly develop the Fos3F concrete floating foundation factory at Fos-sur-Mer, targeting annual production of around 30 units for the Mediterranean market.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com