BOKA Vanguard heavy transport vessel: design and service history

BOKA Vanguard’s history includes offshore platform moves, dry-dock assignments and a 2024 widening that expanded its deck for wider cargoes. It is now carrying Transocean Endurance to Norway.
Photo: © Boskalis

SHARE ARTICLE

The BOKA VANGUARD heavy transport vessel was designed to move large offshore facilities, ships and other oversized cargo. Built by Hyundai Heavy Industries in 2012, it was developed by Dockwise with Finland-based Deltamarin and first entered service as Dockwise Vanguard. Boskalis acquired Dockwise in 2013 and renamed the vessel BOKA VANGUARD on 30 April 2018.

Dockwise saw a need for a vessel capable of carrying increasingly large floating oil and gas facilities from construction yards to their destinations. The company’s concept was intended to reduce transport time and cost while allowing offshore units to be built economically at shipyards. The resulting vessel has a flat, open deck without a conventional bow, with the bridge and accommodation block positioned on the far starboard side. Four movable buoyancy casings can be repositioned, and the watertight deck is designed to allow water to pass over it.

The original cargo deck measured 275 by 70 metres. In 2024, the vessel was widened by 10.3 metres, taking the deck width to more than 80 metres. The port-side outriggers were relocated and enlarged, increasing the separation between the casings to 80 metres. The modification made room for wider cargoes, including floating dry docks.

The vessel loads floating cargo by submerging its deck. The supplied specifications state that its 93 ballast tanks can lower the deck to about 16 metres below the water’s surface. Cargo is positioned over the submerged deck before the tanks are emptied and the vessel rises. It can also load from a quay or by skidding cargo along tracks. Its stated cargo capacity is up to 110,000 tonnes, and it can accommodate 40 crew.

The first cargo was the 53,000-ton Jack/St. Malo oil platform, loaded in February 2013 at Samsung Heavy Industries in South Korea for transport to the Gulf of Mexico. Other planned assignments at the time included the Goliat FPSO and Aasta Hansteen spar platform, both under construction at Hyundai Heavy Industries. The 193-metre Aasta Hansteen was expected to be the largest floating spar platform built at the time.

The vessel has also been used as a floating dry dock. In 2013, it supported work on the semi-submersible drilling platform Noble Paul Romano in Malta, where local docks could not accommodate the unit. In 2019, it carried Carnival Vista to Grand Bahama for Azipod repairs after a crane collapse put one of the shipyard’s dry docks out of service.

A proposed assignment to transport the Costa Concordia wreck to an Italian scrapping yard did not proceed. The vessel was instead refloated and towed to Genoa in July 2014. After BOKA VANGUARD was widened, it transported a 360-metre floating dry dock to Yalova, Türkiye, in May 2025 and the East End floating dry dock to Grand Bahama in October 2025. The supplied material also lists the 385-metre-long, 60-metre-wide, 36,000-ton fish farm Havfarm 1, also known as Jostein Albert, among its notable cargoes.

The supplied account describes BOKA VANGUARD as currently carrying the semi-submersible drilling rig TRANSOCEAN ENDURANCE to Olen, Norway. HMT News has covered the current transport of the rig.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
The Aberdeen Remote Operations Center received recognition for sustainable investment, while OEUK honoured a decommissioning initiative backed by over £400 million in committed and planned investment.
A technical examination of modern semi-submersible heavy transport operations, covering ballast control, submerged stability, cargo positioning, cribbing, load transfer and float-off procedures.
BOKA Sub C completed the Errea Wittu FPSO hook-up in Guyana’s Stabroek Block at nearly 1,700 metres. Four tugs supported the operation. MODEC reported first oil on 16 November 2026.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com