Search
Close this search box

Vattenfall to Market 200 MW of Balancing Power from Veja Mate

Vattenfall is marketing 200 MW of balancing reserve capacity from the 416 MW Veja Mate offshore wind farm after its prequalification in TenneT TSO's German control area.
Source: El Periódico de la Energía

SHARE ARTICLE

Vattenfall is marketing 200 MW of balancing reserve capacity from the 416 MW Veja Mate offshore wind farm in the German North Sea, following the project’s qualification to participate in Germany’s electricity balancing market.

The company announced on 19 October 2026 that the wind farm had completed the required prequalification process within the control area of transmission system operator TenneT TSO.

According to Vattenfall, the 200 MW represents the largest amount of balancing reserve capacity offered by an offshore wind farm to date.

The qualification allows capacity from Veja Mate to be offered in the balancing market, where transmission system operators activate reserves to address short-term imbalances between electricity generation and consumption and maintain the grid frequency at 50 hertz.

Veja Mate is located approximately 95 kilometres northwest of Borkum Island in the German North Sea. The 416 MW wind farm comprises 67 turbines and is owned by a consortium consisting of Commerz Real, Ingka Group, KGAL Group and wpd invest.

Vattenfall acts as the wind farm’s direct electricity marketer, handling the sale and optimisation of its power generation.

The company also participates in the balancing market through pumped-storage hydropower plants with a combined capacity of 2.7 GW. It is pursuing further prequalification of renewable energy assets and battery storage systems for balancing services.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Dogger Bank A has secured an eight-month extension to the CfD start date for its first 300 MW contract tranche. The revised July 2027 deadline follows turbine blade failures and additional repair requirements.
Sven Utermöhlen brings 20 years of offshore wind experience to Esvagt. RWE’s succession announcement also provided for him to advise its offshore wind business for six to twelve months after his departure.
Shenhai Hydrogen Energy No. 1 is preparing for South China Sea deployment, with PEM electrolysis, three types of hydrogen storage and a disconnectable mooring system designed for shallow waters.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com