Search
Close this search box

TRIUMPH Ships Monopiles from Germany to Canada

TRIUMPH departed Bremerhaven on 23 March 2026 with offshore wind monopiles bound for Argentia, Canada, where arrival is estimated for 7 April 2026.
Photo source: Steelwind Nordenham

SHARE ARTICLE

The heavy lift vessel TRIUMPH is carrying out a transatlantic shipment of offshore wind monopiles, manufactured by Steelwind Nordenham, from Germany to Canada.

Vessel tracking data shows that TRIUMPH departed Bremerhaven on 23 March 2026 and is bound for Argentia, Canada. Estimated arrival is 7 April 2026. At the time of reporting, the vessel was transiting the English Channel.

TRIUMPH is a Boskalis’ Semi-submersible Heavy Lift Vessel and is sailing under the flag of CURACAO. Her length overall (LOA) is 216.86 meters and her width is 44.5 meters.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Four Liebherr mobile harbour cranes weighing up to 460 tonnes each were transported from Rostock to Fujairah aboard a heavy lift vessel operated by dship Carriers.
Dajin Heavy Industry has signed an MoU with Ardersier Port in Scotland to jointly develop an offshore wind logistics hub for fixed-bottom and floating wind projects.
Inch Cape turbine components are arriving at the Port of Dundee, where 576 components for 72 Vestas V236-15MW turbines will be handled ahead of offshore installation.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com