Search
Close this search box

CMHI wins semi-submersible salvage vessel order with 10,000-tonne lifting capacity

The 175-metre semi-submersible vessel ordered by the Shanghai Salvage Bureau will feature DP3 positioning, a 12-point mooring system and diesel-LNG dual-fuel machinery for deepwater salvage.
Image credit: AI-edited illustration based on an image published by CNSS.

SHARE ARTICLE

China Merchants Heavy Industry (Jiangsu) (CMHI) has secured an order from the Shanghai Salvage Bureau of China’s Ministry of Transport to build a semi-submersible salvage vessel equipped with two 5,000-tonne revolving cranes.

The construction contract was signed in Shanghai on 4 November 2026, according to Chinese maritime publication CNSS. The vessel has been designed by the 708 Research Institute of China State Shipbuilding Corporation (CSSC) for heavy-lift salvage, emergency response and recovery operations in challenging offshore and deepwater conditions.

The design specifications outline a vessel measuring approximately 175 metres in length, with a moulded breadth of 88 metres and a moulded depth of 45 metres. Its operating draught will range from 24 to 26 metres.

The semi-submersible vessel will be equipped with two fully revolving cranes, each rated at 5,000 tonnes. According to CNSS, the cranes will provide a tandem lifting capacity of 10,000 tonnes, supporting large-scale salvage and vessel recovery operations.

The vessel will feature a diesel-LNG dual-fuel power system, DP3 dynamic positioning and a 12-point mooring arrangement. Designed for unrestricted navigation, it will accommodate 480 personnel, with a minimum design speed of eight knots, a range of 10,000 nautical miles and an endurance of 60 days.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
The 38,000-dwt newbuild is the second in a four-vessel series built by ZPMC, featuring 5,066 square metres of cargo deck space and a maximum tandem lifting capacity of 700 tonnes.
The South Korean shipbuilder has nominated its COO to succeed Choi Sung-an, who is expected to retire in March 2027, with the company's 2026 order intake reaching $12.7 billion as of 16 November.
The 75,000 dwt newbuilding is due for delivery in the first quarter of 2029, with an option for a second vessel that could bring the reported contract value to approximately $380 million.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com