Search
Close this search box

DEME wins €300m-plus Allseas subcontract for PRGT marine works

DEME will undertake seabed preparation and landfall construction along the 50-kilometre offshore section of the PRGT pipeline, with preparations in 2027 followed by two offshore campaigns.
Photo: DEME

SHARE ARTICLE

Belgian marine contractor DEME has secured a subcontract from Allseas for PRGT marine works on the Prince Rupert Gas Transmission pipeline in British Columbia, Canada.

Announced on 23 November 2026, the award falls within DEME‘s large contract category, which covers agreements valued at more than €300 million. The precise contract amount has not been disclosed.

The company’s Offshore Energy division will perform seabed preparation and marine construction along the approximately 50-kilometre offshore section of the natural gas pipeline.

The contract scope includes pre-trenching, pipeline stabilisation, span rectification before and after pipelaying, and stabilisation of curved pipeline sections. Further activities comprise engineered and natural backfilling, side-casting backfill with locally available seabed material, and the construction of crab bridges.

DEME will also undertake landfall construction at four locations: Nass Bay, Iceberg Bay, Nasoga Gulf and Wil Milit.

The contractor will mobilise specialised dredging and offshore construction equipment, supported by crew transfer, survey and accommodation vessels. Preparatory activities are scheduled to commence in 2027, followed by two offshore construction campaigns.

In July 2026, Allseas announced that it had secured the main offshore installation contract from Western LNG. The work covers approximately 50 kilometres of concrete-weight-coated pipelines with diameters of 36 and 48 inches.

Allseas plans to deploy its pipelay vessels Solitaire and Sandpiper for installation in 2029, with operations extending into water depths of up to 450 metres.

The PRGT pipeline is being developed by NW Infrastructure Limited Partnership, a joint venture between Western LNG and the Nisga’a Nation. It will supply natural gas from northeastern British Columbia to the proposed Ksi Lisims LNG export facility on Pearse Island.

The floating LNG development, a joint initiative involving the Nisga’a Nation, Rockies LNG and Western LNG, is designed to produce 12 million tonnes of LNG annually, targeting export markets primarily in Asia.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Spain has activated its level-two maritime pollution contingency plan over the vessel's estimated cargo of 7,000 tonnes of diesel, with no visible pollution reported during the initial survey.
The shipbuilder has decided against participating in the KHNP-led development after months of uncertainty, while local media report that estimated project costs have risen to KRW 6 trillion.
The 38,000-dwt newbuild is the second in a four-vessel series built by ZPMC, featuring 5,066 square metres of cargo deck space and a maximum tandem lifting capacity of 700 tonnes.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com