Search
Close this search box

Heavy Transport

OSS Jasmund Set for Transportation

The OSS Jasmund topside and jacket have completed load-out and are prepared for transportation to the Baltic Sea. The 4,500-ton topside and 72m jacket were built by HSM Offshore Energy and Smulders with support from a tailor-made grillage.

Harbor Bridge Truss Removed in Corpus Christi

Mammoet removed the 2,300t truss of the US 181 Harbor Bridge in Corpus Christi for TxDOT and FlatironDragados. The structure was lowered 50 meters, loaded onto a barge, and moved using 108 axle lines of SPMT.

MV GHT MARINAS Arrives at VOCV Port With 103 Wind Blades

MV GHT MARINAS berthed at VOC Port with 103 imported wind turbine blades for Envision Energy. The arrival comes as the port records higher TEU volumes and increased handling of windmill components through October 2025.

Sarens–NorSea Renew Long-Term Heavy Transport Agreement

Sarens and NorSea continue their long-running cooperation for transporting large offshore components along Norway’s west coast. Their renewed agreement covers engineered movements of cable reels and subsea structures using specialised SPMT equipment.

CWHI Completes Second Shipment of XXL Monopiles for Inch Cape

CWHI has completed the second shipment of eight XXL monopiles for the Inch Cape Offshore Wind Farm. Transported on the ZHENHUA 33 and manufactured at the Qinzhou Yard, the components—up to 11.5 m wide and 2,300 t—were discharged at the Port of Leith.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com