
Storm Delays Trustee’s Delivery of Anne-de-Bretagne Bridge Deck
The Anne-de-Bretagne Bridge deck convoy has again sheltered off Belle-Île due to Atlantic winds. Offload near Saint-Nazaire is expected after the weekend, with Nantes arrival next week.

The Anne-de-Bretagne Bridge deck convoy has again sheltered off Belle-Île due to Atlantic winds. Offload near Saint-Nazaire is expected after the weekend, with Nantes arrival next week.

Seaspan Careen was loaded onto GPO Emerald in Vancouver Harbour and is scheduled to sail to Indonesia for upgrades, including bottom reinforcement to lift larger and heavier ships.

BigLift Shipping orders a next-generation heavy lift vessel, a full sister ship of Happy Star, featuring 2,200 t tandem lift capability and Finnish/Swedish 1A Ice Class construction.

Mammoet completed a record outward shipment at Khalifa Port, moving 24 PAU/PAR modules about 2.5 km and exporting them in four consignments using SPMTs and load cells for weight checks.

CCCC Third Harbor Engineering took delivery of Sanhanggong 9 at Ningbo Port on 12 February. The semi-submersible barge offers 18,000-tonne lift capacity and supports caisson and wind jacket transport.

Jumbo Offshore has completed suction anchor installation and mooring line pre-lay for the FPSO Errea Wittu at Uaru Field, Stabroek Block, Offshore Guyana, on behalf of Modec.

The semi-submersible heavy transport vessel Black Marlin completed a multi-cargo voyage from China to Freetown, safely transporting two barges, two tugboats and a crane barge.

Sarens, with Manora, chartered the 120 m flat-top barge Caroline to load a 3,000 t jacket, pin piles and a transition piece in Ravenna and sail to Rotterdam for Nordseecluster.

AAL Shipping transported a 28 m, 255 t shiploader on AAL Singapore and completed a 312 t gross tandem lift discharge in Bataan, supporting Intra-Asia project cargo needs.
For general inquiries and to contact us,
please email: info@hmt-news.com