Search
Close this search box

Seatrium Begins Steel Cutting for Penta-Ocean’s 5,000-Ton Crane Heavy Lift Vessel

Seatrium has started steel cutting for Penta-Ocean’s 5,000-ton crane Heavy Lift Vessel, part of Japan’s offshore wind expansion strategy.
Image credit: POC

SHARE ARTICLE

Seatrium has reached a construction milestone with the official steel cutting for Penta-Ocean Construction Company Limited’s (POC) Heavy Lift Vessel (HLV). The strike steel ceremony took place on September 29, 2025, at Seatrium’s Nantong yard in China, 246 days after the contract signing.

The vessel is designed with a 5,000-ton main crane and will be one of the largest self-propelled heavy lift vessels currently under construction. Steel fabrication is also in progress at Seatrium’s Subic yard in the Philippines.

This HLV is part of a larger initiative announced on January 27, 2025, when POC and Fuyo General Lease Co., Ltd. (Fuyo Lease) revealed plans to jointly own two advanced offshore construction vessels: the heavy lift vessel and a cable laying vessel (CLV). The HLV, which Seatrium is building, will feature a fully revolving 5,000-ton lifting crane. Its design is intended to handle increasingly heavier monopile foundations required for installing next-generation offshore wind turbines in the 15 to 20MW class.

The total estimated construction cost of the HLV is around JPY 120 billion. Once completed, it will be jointly owned by a POC subsidiary (50%) and Fuyo Lease (50%). This vessel is positioned to play a critical role in Japan’s offshore wind development, particularly as the market shifts to full-scale construction in general sea areas beyond port zones.

Image courtesy of Seatrium

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
RWE and TotalEnergies’ OranjeWind venture has signed a five-year charter with Purus for Purus Power to support O&M work at the Dutch offshore wind farm.
COSCO Shipping Specialized Carriers has completed the transport and float-over installation of the offshore converter platform for the Qingzhou V & VII offshore wind project in China.
A Massachusetts judge has denied GE Vernova’s appeal in the Vineyard Wind case, keeping a preliminary injunction in place for the Vineyard Wind 1 offshore wind project.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com