Search
Close this search box

Constellation secures ABS AiP for Laguna Star fuel processor

Constellation has secured ABS Approval in Principle for its Fuel Processor project under testing aboard Laguna Star and signed an MoU with ABS covering offshore efficiency and emissions technologies.
Drillship Laguna Star (Photo source: Vessel Finder)

SHARE ARTICLE

Constellation Oil Services has secured Approval in Principle from the American Bureau of Shipping (ABS) for its Fuel Processor project, which is being implemented and tested aboard the drillship Laguna Star.

The technology is designed to improve energy efficiency and reduce emissions from diesel engines used on offshore units. Constellation announced the ABS AiP during ROG.e 2026.

Industry reports said the pilot project was contracted at the end of 2025 and is expected to continue through 2028. It is being developed with Petrobras using funding linked to Brazil’s National Agency of Petroleum, Natural Gas and Biofuels research, development and innovation clause.

Clean Energy Power Systems is also involved in the project, while PUC-Rio is serving as an independent third party responsible for validating the results, according to the same reports.

Alongside the AiP, Constellation and ABS signed a memorandum of understanding to cooperate on technologies aimed at improving operational efficiency and reducing emissions in offshore operations.

Constellation’s official announcement did not detail the individual technologies covered by the MoU. Drilling Contractor reported that the framework includes technical discussions on hybridisation using battery energy storage systems and closed-bus operations, as well as guidance and potential future certification work.

The Fuel Processor remains in the pilot phase aboard Laguna Star, with implementation and testing continuing following the ABS Approval in Principle.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
COOEC has set 2027 as its target for a first Brazilian FPSO contract after placing second in the Albacora tender. The project has progressed to commercial negotiations between Petrobras and Yinson.
Transocean reports about $1.1 billion in firm backlog additions as Equinor approves a three-rig agreement and Shell awards Transocean Norge two wells, with an estimated drilling duration of 120 days.
Stena DrillMAX has reportedly departed Las Palmas for Namibia to support Shell's PEL 39 drilling programme, following the Merlin-1X exploration results in the Orange Basin.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com