Search
Close this search box

UKMTO Reports Hormuz Tanker Attack and Onboard Fire

UKMTO issued a warning on 1 October after receiving a third-party report of a tanker strike and fire in the Strait of Hormuz. Crew safety was reported, but damage and environmental effects were unknown.
UKMTO map marking the area of the reported tanker attack in the Strait of Hormuz
Image: UKMTO

SHARE ARTICLE

UK Maritime Trade Operations (UKMTO) has reported a Hormuz tanker attack in which an unidentified projectile reportedly hit a vessel and started a fire. UKMTO relayed that the crew was safe, while the damage and possible environmental consequences remained unknown.

The agency issued Warning 147-26 on 1 October 2026 after receiving information from a third party. The notice recorded 17:50 UTC as the report time and stated that the tanker had been passing through the Strait of Hormuz.

Neither the vessel’s name nor the party responsible was identified in the warning. With an investigation underway, UKMTO called for caution among ships navigating the area and asked them to report suspicious activity.

The incident follows earlier tanker attacks in the Strait of Hormuz. UKMTO issued three other warnings on 30 September concerning reported projectile strikes on 29 September. Those notices covered separate incidents from the tanker fire described in Warning 147-26.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Dajin Heavy Industry is supplying 60 monopiles for Nordseecluster B, each weighing around 1,350 tonnes, with Buss Ports handling the foundations ahead of offshore installation in 2027.
The 390 MW Polish offshore wind development is under construction, with foundation installation planned for the first half of 2027 and electricity generation expected in 2028.
Arabian Drilling has secured 10- and 15-year commitments for two self-propelled offshore service units with Khafji Joint Operations, lifting its contracted backlog to a record SAR 18.5 billion.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com