Search
Close this search box

McDermott Ships 4,600-Tonne Shell Manatee Topsides from Altamira

McDermott has shipped the 4,600-tonne Shell Manatee topsides from Altamira, Mexico, to Trinidad and Tobago. The structure will be installed offshore as part of the Manatee gas development.
Photo source: McDermott

SHARE ARTICLE

McDermott has dispatched the 4,600-tonne topsides for Shell‘s Manatee offshore gas project from its Altamira Fabrication Yard in Mexico. The structure is being transported to Trinidad and Tobago for offshore installation.

According to the Altamira Port Authority, fabrication was completed on 23 September 2026. The topsides measure 60.5 m in length, 51.8 m in width and 71.1 m in height, excluding the flare system.

The project involves separate fabrication activities in Mexico and Trinidad and Tobago. While the topsides were built at McDermott‘s Altamira yard, the jacket was fabricated by Trinidad Offshore Fabricators Company (TOFCO) at the La Brea Industrial Estate. According to La Brea Industrial Development Company (LABIDCO), the jacket’s Row C section and associated piles were loaded out at the Port of Brighton on 14 September 2026.

McDermott secured the engineering, procurement, construction and installation (EPCI) contract for the Manatee development in August 2024, covering the offshore platform, jacket and associated infrastructure.

Located approximately 100 km off the southeast coast of Trinidad and Tobago, the Manatee gas field is wholly owned by Shell. The development is expected to begin production in 2027, with peak output estimated at 604 million standard cubic feet of gas per day.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
COSCO Shipping Specialized Carriers has named Xiangqingkou, its first 70,000-tonne-class semi-submersible vessel. It has a DP2 system, a 9,850-square-metre cargo deck and a maximum submergence depth of 27.5 metres.
BOKA Vanguard’s history includes offshore platform moves, dry-dock assignments and a 2024 widening that expanded its deck for wider cargoes. It is now carrying Transocean Endurance to Norway.
Aker Solutions has received an LOI from Allseas to dismantle and recycle Equinor's 50,000-tonne Statfjord A topside after offshore removal by Pioneering Spirit.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com