Search
Close this search box

Panama Canal Cuts Neopanamax Draft to 14.48 m

Panama Canal Authority will cut the Neopanamax maximum draft to 14.63 m on 26 August and 14.48 m on 3 September under its water management measures.
Photo: Panama Canal

SHARE ARTICLE

Panama Canal Authority will make two further adjustments to the maximum allowable draft at the Panama Canal’s Neopanamax Locks as part of its water management measures.

Under Advisory to Shipping No. A-25-2026, the maximum allowable draft will be reduced to 14.63 m (48.0 ft) Tropical Fresh Water from 26 August 2026. A second adjustment will lower the limit to 14.48 m (47.5 ft) from 3 September 2026 until further notice.

The authority said the changes were based on Gatun Lake water levels and updated weather projections. They form part of water conservation and resource management measures introduced in December 2025 in preparation for the 2026 dry season.

The latest measures represent the fourth and fifth draft adjustments announced for the Neopanamax Locks.

Panama Canal Authority said the draft changes will not reduce daily vessel transit capacity. Available transit slots at the Panamax and Neopanamax Locks will remain unchanged.

The authority has been monitoring hydrological conditions and the potential effects of El Niño on the canal watershed. It said further operational changes could be announced depending on lake levels and updated hydrological projections.

The canal uses water stored in Gatun and Alhajuela Lakes for vessel transits as well as for water supply in Panama. Panama Canal Authority has been implementing water-saving measures at the locks while monitoring reservoir conditions.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Capesize bulk carrier Cape Falcon has been refloated off Gladstone after being aground since 18 September. The vessel remains detained pending safety checks and further investigation.
Van Oord has named its two new 35,000-tonne flexible fallpipe vessels Vindnes and Vestnes, now under construction in China for delivery in 2028 and 2029.
Seatrium has delivered LNGT Turkiye, completing the seventh LNG carrier-to-FSRU conversion for Karpowership under an eight-year programme at its Admiralty yard in Singapore.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com