Search
Close this search box

GPO Sapphire Delivers HEA Hercules to Rotterdam

GPO Sapphire has delivered the jack-up barge HEA Hercules to Rotterdam, where the unit was discharged using a float-off operation.
Image source: Tommie Tijhuis / Facebook

SHARE ARTICLE

The heavy lift vessel GPO Sapphire from GPO Heavylift has completed the transport of the jack-up barge HEA Hercules owned by HEA Energy to the Port of Rotterdam.

The cargo measured about 127 m in length and more than 40 m in width, making it a large-scale deck transport operation.

After arriving in Rotterdam, HEA Hercules was discharged using the float-off method by submerging GPO Sapphire. Following discharge operations, the jack-up barge continued its voyage with assistance from two tug boats operated by FAIRPLAY TOWAGE Group.

Image source: Jan Oosterboer / Facebook

Source: Oudkerk B.V.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Sarens completed lifting, weighing, transport and load-out work for Angola’s South Ndola project, including a 1,150 t jacket, pin piles and a 575 t topside.
The Neptun Alpha topside transported from Indonesia by GPO Emerald has been installed offshore for the Neptun Deep gas project in Romania’s Black Sea.
OMV Petrom and ROMGAZ have completed installation of the 16,500 t Neptun Alpha platform for the Neptun Deep gas project in Romania’s Black Sea, with production planned for 2027.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com