Search
Close this search box

Ocean Winds Starts Power at French Floating Wind Farm

Ocean Winds has started power production at its 30 MW floating wind farm off Port-La Nouvelle, marking its first project in France.
Image source: Ocean Winds

SHARE ARTICLE

Ocean Winds has begun electricity generation at the 30 MW Éoliennes Flottantes du Golfe du Lion floating offshore wind project, located off Port-La Nouvelle in southern France.

The company confirmed the project marks its second operating floating wind farm and its first in France, supplying renewable energy to homes and businesses in the region.

Developed in partnership with Banque des Territoires, the wind farm comprises three 10 MW turbines installed on floating foundations about 16 km offshore.

The pilot facility is expected to generate around 110,000 MWh annually, enough to meet the electricity needs of about 50,000 inhabitants over a 20-year period.

Ocean Winds stated that around 85% of its direct suppliers are French or France-based, while more than 99% are located within Europe. Around 60% of these suppliers are small and medium-sized enterprises.

The project also supports more than 20 operational jobs at Port-La Nouvelle.

Craig Windram, chief executive of Ocean Winds, said the start of electricity production reflects the company’s experience in floating offshore wind and its capability to deliver and operate offshore wind technologies.

Marc Hirt, country manager for France at Ocean Winds, said the milestone is important for France’s energy sovereignty and for floating wind development, highlighting the role of European and French industry participants.

The company said the project serves as a pilot for larger developments, including the 250 MW Eoliennes Flottantes d’Occitanie project awarded in late 2024 with Banque des Territoires.

The wind farm also includes artificial marine habitats designed by Ecocean to support biodiversity as part of a nature-inclusive approach.

Ocean Winds added that the project builds on its WindFloat Atlantic floating wind farm and supports the wider scale-up of floating offshore wind technology.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
TWD has highlighted its work with Van Oord on Boreas, designing monopile deck systems that support transport, securing and installation of large offshore wind foundations.
Belgium has completed a key offshore construction phase for Princess Elisabeth Island, with 23 caissons forming the structure’s perimeter, while the first 700 MW wind tender linked to the North Sea hub remains on hold.
Nexans has added CLV Nexans Electra to its fleet, a 149.9 m cable-laying vessel built for offshore wind export systems and interconnectors.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com