Search
Close this search box

Worker Dies at Tuas Shipyard; MOM Investigates

A 24-year-old welder died at a Tuas shipyard worksite occupied by Seatrium after he was found unconscious inside a 28-inch stainless-steel pipe on board a newly fabricated process module. Singapore’s Ministry of Manpower said it is investigating the incident and restated confined-space safety measures.
Photo source: Seatrium

SHARE ARTICLE

A 24-year-old worker died at a shipyard in Tuas after he was found unconscious inside a stainless steel pipe, with Singapore’s Ministry of Manpower investigating the incident.

According to the ministry, the fatal workplace accident took place at a worksite occupied by Seatrium on Tuas South Boulevard. The worker was a welder and was found lying unconscious inside a 28-inch stainless-steel pipe on board a newly fabricated process module of a vessel.

He was later extricated from the pipe and pronounced dead at the scene by paramedics.

The ministry said the deceased was employed by Hwa Leong Offshore Engineering.

A Ministry of Manpower spokesperson said all confined spaces must be clearly identified and labeled as a general safety measure. The spokesperson also said that before work begins, relevant risk control measures, including atmospheric testing, adequate ventilation, and the application of permit-to-work procedures, must be implemented to address foreseeable hazards associated with confined spaces.

The ministry added that Singapore recorded 36 workplace deaths in 2025. Workplace fatality fell to a record low of 0.96 per 100,000 workers. The three main causes of workplace fatalities last year were vehicular incidents, falls from height, and the collapse or failure of structures and equipment.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
New Fortress Energy has sold Sevan Driller and Sevan Brasil for demolition after previously planning to convert the former Seadrill units into floating LNG liquefaction facilities.
Heerema Fabrication Group has completed the first roll-up for the IJmuiden Ver Beta 2GW jacket in Vlissingen, lifting a 1,700-tonne steel section into an upright position.
Seatrium is preparing the P-80 and P-82 FPSOs to sail for Brazil’s Búzios field, where the two units will provide a combined oil production capacity of 450,000 bopd.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com