Search
Close this search box

JSI Alliance’s Fairplayer Delivers Four RTG Cranes to Gulftainer in Khor Fakkan

JSI Alliance's heavy lift vessel Fairplayer has delivered four RTG cranes from Cork, Ireland, to Gulftainer in Khor Fakkan. Each crane weighed approximately 150 tonnes and required detailed transport planning.
Photo source: Jumbo

SHARE ARTICLE

JSI Alliance has completed the transport of four rubber-tyred gantry (RTG) cranes from Cork, Ireland, to Khor Fakkan, where the equipment was delivered to port operator Gulftainer aboard the heavy lift vessel Fairplayer.

Each crane weighed approximately 150 tonnes, placing the cargo well within the vessel’s lifting capacity. Fairplayer is equipped with two deck cranes, each rated at 900 tonnes.

Despite the relatively modest weight of each unit compared with the vessel’s lifting capacity, the dimensions and configuration of the RTG cranes required detailed planning and engineering preparations.

The loading operation in Cork involved JSI Alliance‘s project team and the vessel’s crew, including Senior Port Captain Patrick Lieuw. The team completed the operation before the vessel transported the cranes to their destination.

According to SAL‘s official announcement, all four RTG cranes have arrived safely in Khor Fakkan, where Gulftainer plans to deploy the equipment in its port operations.

The shipment was carried out using Fairplayer‘s onboard heavy lift equipment. The vessel has also been used for other project cargo operations, including a module discharge in Rotterdam.

The latest delivery involved handling four large port cranes whose dimensions and configuration required specific engineering considerations, despite their individual weights being substantially below the vessel’s rated lifting capacity.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
SAL Heavy Lift's MV Hilke transported 11 floating offshore wind foundation components across two voyages at Denmark's Hvide Sande port, handling cargo weighing up to 596 t under strict vessel draft and length restrictions.
Sarens has completed the load-out of floating dock sections weighing approximately 4,000 t each at Szczecin Shipyard in Poland, using 168 SPMT axle lines and six KAMAG K24ST power pack units.
Boskalis' semi-submersible vessel Forte has delivered SpaceX's recovered Starship Ship 40 to Brownsville, Texas, after a 12,729-nautical-mile voyage involving float-on loading near Christmas Island.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com