Search
Close this search box

Hanwha Philly Shipyard cuts steel for Jones Act MR tanker

Hanwha Shipping is due to take delivery of four U.S.-built tankers in 2029 and 2030. The vessels will each have a deadweight of about 49,500 tonnes and will be able to carry oil and chemicals.
Photo source: Hanwha Philly Shipyard

SHARE ARTICLE

Hanwha Philly Shipyard cut steel in Philadelphia on 17 November 2026 for a Jones Act MR tanker, the first of four vessels ordered by affiliate Hanwha Shipping. Deliveries for the four medium-range tankers are slated for 2029 and 2030.

Each tanker will have a deadweight of about 49,500 tonnes. All four are to be built at the U.S. yard and designed for Jones Act compliance. They are designed to carry crude oil, refined petroleum products and chemical cargoes.

In its steel-cutting announcement, the yard said the design would prioritize energy efficiency and meet the International Maritime Organization’s Type 2 and Type 3 standards for chemical carriage. The shipbuilder is also offering a Type 2 option with 18 segregations so different cargoes can be carried separately.

Hanwha Shipping CEO James Sagar said the lead vessel will be the first MR tanker built in the United States in nearly a decade. The Philadelphia yard has previously built 24 tankers in the 46,000-to-50,000-dwt range for Overseas Shipping Group and American Petroleum Tankers, according to The Maritime Executive.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com