Search
Close this search box

Halifax Launches First Coast Guard AOPS

Halifax Shipyard has launched the future CCGS Donjek, the Canadian Coast Guard’s first AOPS, supporting fleet renewal, Arctic operations and Canada’s National Shipbuilding Strategy.
Image: Irving Shipbuilding

SHARE ARTICLE

Halifax Shipyard has launched the Canadian Coast Guard’s first Arctic and Offshore Patrol Ship, the future CCGS Donjek, advancing Canada’s National Shipbuilding Strategy and the renewal of the Coast Guard fleet.

The 104.7 m vessel was moved from the yard’s land level facility to a submersible barge on 26 April. It was launched in Bedford Basin late on 28 April 2026 and is now alongside at Halifax Shipyard, where work continues ahead of sea trials and delivery to the Canadian Coast Guard later this year.

Halifax Shipyard is also building the second and final Coast Guard AOPS, the future CCGS Sermilik, with work progressing as scheduled.

The Coast Guard AOPS vessels will support fisheries enforcement on Canada’s east coast, search and rescue, icebreaking operations and a stronger Arctic presence during the summer. They will serve as the Coast Guard’s primary platform for these expanded duties.

Before the Coast Guard variants, Irving Shipbuilding delivered six Harry DeWolf-class AOPS vessels to the Royal Canadian Navy. The company is also progressing Canada’s River-class Destroyer program. Full rate production began in April 2025, and keel laying for the first vessel, the future HMCS Fraser, is planned for June 2026.

Since the National Shipbuilding Strategy was launched, Irving Shipbuilding has expanded its workforce, upgraded facilities and built a domestic shipbuilding supply chain. Its current program includes six AOPS delivered to the Royal Canadian Navy, two AOPS for the Canadian Coast Guard and 15 River-class Destroyers for the Royal Canadian Navy.

Officials said the launch reflects Canada’s investment in domestic shipbuilding capacity, skilled jobs, sovereign capability and fleet renewal.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
The 158-metre Polar Class 2 icebreaker will have 47 MW of installed power and support year-round Arctic operations. Delivery to the Canadian Coast Guard is scheduled for 2032.
MSC Baltic III has been moved about 53 m toward shore at Wild Cove, Newfoundland, as crews continue preparations to bring the grounded containership ashore for dismantling.
CEVA Logistics | Fagioli completed the engineering, transport, load-out and launch of CCGS Donjek at Halifax Shipyard using 232 SPMT axle lines and a semi-submersible barge.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com