
4,500 t OSS Jasmund topside transits Rotterdam
The 4,500 t OSS Jasmund offshore substation topside has been transported through central Rotterdam on Heerema’s H-408 barge after load-out at HSM Offshore Energy’s Stormpolder yard, bound for the Windanker wind farm.







