Search
Close this search box

Seatrium Wins Hammerhead FPSO Integration Contract from MODEC

Seatrium will integrate topside modules and fabricate the flare tower and crane pedestal for MODEC's Essequibo 1899 FPSO, designed to produce 150,000 barrels of oil per day offshore Guyana.
Essequibo (Image source: MODEC)

SHARE ARTICLE

Seatrium has secured a Hammerhead FPSO integration contract from MODEC, covering topside integration and fabrication work on Essequibo 1899, which will be deployed at ExxonMobil’s Hammerhead development offshore Guyana.

Announced on 16 November 2026, the contract includes topside module integration, fabrication of the flare tower and crane pedestal, and support for pre-commissioning and commissioning activities.

Seatrium did not disclose the contract value.

The Essequibo 1899 FPSO is designed to produce approximately 150,000 barrels of oil per day, with associated gas and water handling capabilities. The converted vessel will have a crude oil storage capacity of 1.6 million barrels and will be moored in water approximately 1,025 metres deep.

Hammerhead is ExxonMobil’s seventh development in Guyana’s Stabroek block. The company approved the USD 6.8 billion project in September 2025, with first oil targeted for 2029.

According to MODEC’s official project information, the Japanese company is responsible for engineering, procurement, construction and installation (EPCI) of the FPSO. Its contract also includes operations and maintenance services for 10 years.

The development is also the subject of a separate Hammerhead FPSO mooring pre-lay contract awarded to DOF.

The latest award is Seatrium’s second FPSO integration project for MODEC in Guyana, following its completed topside installation and integration work on Errea Wittu for the Uaru development.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Seatrium has reduced its global shipyard network from 15 to 11 facilities, with Admiralty Yard due to be returned to the Singapore government in 2028 and Tuas Yard focusing on higher-value repairs.
Indonesian investor Prima Energy argues that two seats on Jadestone's nine-member board would give it representation below its shareholding, while Jadestone seeks safeguards against conflicts of interest.
Dajin Heavy Industry is supplying 60 monopiles for Nordseecluster B, each weighing around 1,350 tonnes, with Buss Ports handling the foundations ahead of offshore installation in 2027.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com