Seatrium has secured a Hammerhead FPSO integration contract from MODEC, covering topside integration and fabrication work on Essequibo 1899, which will be deployed at ExxonMobil’s Hammerhead development offshore Guyana.
Announced on 16 November 2026, the contract includes topside module integration, fabrication of the flare tower and crane pedestal, and support for pre-commissioning and commissioning activities.
Seatrium did not disclose the contract value.
The Essequibo 1899 FPSO is designed to produce approximately 150,000 barrels of oil per day, with associated gas and water handling capabilities. The converted vessel will have a crude oil storage capacity of 1.6 million barrels and will be moored in water approximately 1,025 metres deep.
Hammerhead is ExxonMobil’s seventh development in Guyana’s Stabroek block. The company approved the USD 6.8 billion project in September 2025, with first oil targeted for 2029.
According to MODEC’s official project information, the Japanese company is responsible for engineering, procurement, construction and installation (EPCI) of the FPSO. Its contract also includes operations and maintenance services for 10 years.
The development is also the subject of a separate Hammerhead FPSO mooring pre-lay contract awarded to DOF.
The latest award is Seatrium’s second FPSO integration project for MODEC in Guyana, following its completed topside installation and integration work on Errea Wittu for the Uaru development.