Search
Close this search box

Seatech Engineering and CRIST Develop SE-103 UXO Vessel for Baltic Sea

Seatech Engineering and CRIST S.A. are developing the 95 m SE-103 UXO vessel concept for seabed clearance work involving UXO and hazardous materials in the Baltic Sea.
Image source: View company: Seatech Engineering

SHARE ARTICLE

Seatech Engineering and CRIST S.A. are developing the SE-103 UXO, a 95 m vessel concept for seabed operations involving unexploded ordnance and hazardous materials in the Baltic Sea.

The vessel is planned with diesel-electric propulsion, dynamic positioning capability and a large working deck. Its equipment package is expected to include specialised ROV, sonar, launch and recovery, and UXO handling systems.

The concept is intended to support seabed clearance work in areas designated for offshore wind farms, subsea cables and other marine infrastructure.

The project is being developed as Poland expands work related to hazardous materials on the seabed. A government-approved action plan for 2027 covers the identification, monitoring and removal of hazardous materials from Polish maritime areas, including legacy chemical munitions.

The plan also covers monitoring of UXO-related activity linked to offshore wind development.

Seatech Engineering and CRIST S.A. are preparing the SE-103 UXO for this type of marine operation. The development brings together engineering and shipbuilding expertise from the two companies.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Vineyard Wind 1 has reached full commercial operation off Massachusetts. The $4.5 billion offshore wind project features 62 turbines with a combined generating capacity of 800 MW.
Ørsted says the 704 MW Revolution Wind farm reached full commissioning in October and now supplies power to Rhode Island and Connecticut. Installation of all 65 Siemens Gamesa turbines was completed in September.
VARD has cut the first steel for NB 1004, the second CSOV ordered by UPO. The hybrid vessel is being built at Vard Vung Tau for offshore wind operations in Taiwan and the wider Asia-Pacific region.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com