Search
Close this search box

Jan De Nul Joins First CCS Project with Simon Stevin in North Sea

Jan De Nul will take part in its first CCS project, using Simon Stevin to install protective rock over a North Sea CO₂ pipeline for the Northern Endurance Project.
Image source: Jan De Nul

SHARE ARTICLE

Jan De Nul is taking part in its first Carbon Capture and Storage (CCS) project through the Northern Endurance Project in the North Sea.

The company will work as a subcontractor to Saipem and install protective rock over a CO₂ pipeline on the seabed.

The work will be carried out over the coming months using Simon Stevin. The vessel will place rock through a vertical fall pipe in water depths of 30 to 60 m.

The pipeline has a diameter of 1 m and will transport captured CO₂ from the Teesside and Humber industrial areas on the east coast of England to storage beneath the North Sea.

The Northern Endurance Project is the first CCS project involving Jan De Nul.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Equinor plans to route Grimsnes volumes through Stjerne to Oseberg Sør, with two or three wells under consideration and subsea equipment procurement planned before project sanction.
DOF will deploy a construction support vessel in Q1 2027 to remove subsea infrastructure and clear the seabed across several offshore fields, with engineering and disposal also included in the contract.
Galdor Exploration will gain access to TGS data and technology, including its Seismic Foundation Model, to assess prospects on the Norwegian Continental Shelf and across the wider North Sea.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com