Search
Close this search box

Dajin Heavy Industry Signs MoU with Ardersier Port for Offshore Wind Logistics Hub

Dajin Heavy Industry has signed an MoU with Ardersier Port in Scotland to jointly develop an offshore wind logistics hub for fixed-bottom and floating wind projects.
Photo: Dajin Heavy Industry

SHARE ARTICLE

Dajin Heavy Industry has signed a Memorandum of Understanding with Ardersier Port in Scotland, which is operated by Haventus, to jointly develop an offshore wind logistics hub.

The cooperation will combine Dajin Heavy Industry’s offshore wind engineering and supply-chain capabilities with Ardersier Port’s terminal infrastructure.

The two parties plan to focus on port infrastructure optimisation, global resource sharing and cross-industry collaboration. The cooperation is aimed at supporting fixed-bottom and floating offshore wind projects in the UK and the wider North Sea region.

The agreement follows Dajin Heavy Industry’s earlier partnership with the Port of Cuxhaven in Germany. The company described Ardersier Port as another logistics foothold for its activities in the European North Sea region.

Dajin Heavy Industry’s operations cover wind power equipment manufacturing, heavy-load shipping, foundation installation services and the development of overseas wind energy industrial hubs. The company is listed on the Shenzhen and Hong Kong stock markets.

Under the planned cooperation, Ardersier Port’s location and infrastructure will be combined with Dajin Heavy Industry’s in-house deck-carrier fleet and manufacturing capabilities to support offshore wind supply-chain activities across the British Isles.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Tillen developed a Container Based Crane for Van Oord and a Transition Piece Lifting Tool for SAL to support offshore wind installation activities.
Victoria has opened the first Australian offshore wind auction for an initial 2GW, with bids closing in August 2027 and contracts expected to be awarded in 2028.
Equinor and its partners started Troll Phase 3 stage 2 production ahead of schedule, accelerating 55 billion standard cubic metres of gas from the Troll West reservoir.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com