Search
Close this search box

Eni and TotalEnergies Take FID on Cronos Gas Project

Eni and TotalEnergies have taken FID on the Cronos gas project offshore Cyprus. Four subsea wells will tie back to Zohr, with the gas processed and liquefied at Damietta LNG.
Platform in Zohr field (Photo source: ENI)

SHARE ARTICLE

Eni and TotalEnergies have taken a final investment decision on the Cronos gas project offshore Cyprus, with development planned by 2028.

Cronos is Eni’s first project in Cypriot waters to proceed towards production. The project is expected to reach a production rate of about 500 million standard cubic feet per day.

The development plan includes four subsea wells around 90 nm southwest of Cyprus. The wells will be connected by pipeline to the nearby Zohr field on the Egyptian side of the exclusive economic zone boundary.

The subsea tieback will cross the exclusive economic zones of Cyprus and Egypt. Gas from Cronos will be transported south for processing and liquefaction at the Damietta LNG terminal.

The Damietta facility, also known as SEGAS LNG, was closed from 2013 to 2021 because of insufficient gas supply. It has operated intermittently since 2023 as Egyptian domestic demand has regularly exceeded the supply available for export.

Under an earlier agreement, gas from Cronos is expected to support the restart of the Damietta plant. The volumes are expected to support about 2.8 million tonnes per annum of LNG export capacity.

The project will use existing gas processing infrastructure at Zohr and Damietta.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Silvertip Phase 3 uses existing subsea facilities to supply Perdido, with combined peak output from its two wells expected to reach up to 6,000 boe/d and recoverable resources estimated at 17 million boe.
Orient Adventurer will undertake the offshore campaign in the fourth quarter of 2026, covering disconnection, deck-side retermination and reconnection of a gas lift riser at Ghana’s Jubilee field.
Saipem has secured approximately $121 million in drilling contracts from Eni subsidiaries, assigning Saipem 10000 to Cyprus and the semi-submersible Scarabeo 9 to offshore operations in Ghana.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com