Search
Close this search box

South Korea Offshore Wind Auction Draws Heavy Demand

South Korea’s H1 2026 offshore wind auction drew 9 projects totaling 3.6 GW for 1.8 GW of available capacity.
Image source: SK Innovation E&S

SHARE ARTICLE

South Korea’s H1 2026 offshore wind auction has drawn strong competition, with bidding closing on 12 May for a round offering 1.8 GW of capacity.

Nine projects submitted bids, representing a combined 3.6 GW. That is twice the available capacity. The 1.8 GW tender volume is divided into three tracks: 1 GW for general fixed-bottom projects, 400 MW for publicly led developments, and 400 MW for floating wind.

Copenhagen Infrastructure Partners was the most active bidder, entering four proposals. Its submissions cover the Haesong 1 and Haesong 3 fixed-bottom arrays off the west coast, as well as the Haewoori 2 and Haewoori 3 floating wind projects in the Ulsan cluster off the east coast.

The floating wind track also includes bids from OW Ocean Winds, Kumyang Electric Co., and for the 375 MW East Blue Power phase of the KF Wind project.

The evaluation gives equal weight to price and non-price criteria. Industrial contribution, grid readiness, and community acceptance are among the factors that will affect the result. Winners are expected next month.

The auction supports South Korea’s offshore wind target of 18.3 GW by 2030. It also forms part of a wider tender schedule covering 7 GW to 8 GW across three rounds between H2 2024 and H1 2026.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
California reaffirmed its 25 GW offshore wind target for 2045, with state officials highlighting port investment and floating wind supply chain development.
MacGregor completed DNV-certified sea trials for its Horizon V4 active motion compensated gangway, confirming safe personnel transfers between independently moving offshore assets in open-water conditions.
South Korea’s 532 MW Anma offshore wind project faces delays after a military permit issue disrupted key pre-construction approval.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com