Search
Close this search box

Japan Clears Kujukuri CCS Test Drilling

Metropolitan CCS has secured approval to begin exploratory drilling offshore Kujukuri in Chiba Prefecture, supporting a project that aims to capture industrial CO2, transport it by pipeline, and store it in offshore geological formations.
Photo source: Inpex

SHARE ARTICLE

Metropolitan CCS has received approval from Japan’s Minister of Economy, Trade and Industry to carry out exploratory drilling offshore Kujukuri on the eastern coast of Chiba Prefecture for a carbon capture and storage project.

The approval was issued under the Act on Carbon Dioxide Storage Business after the offshore Kujukuri area was designated as a specified zone in September 2025. Following the acceptance of applications for exploratory drilling permits in that area, Metropolitan CCS, a joint venture between Inpex Corporation and Kanto Natural Gas Development, was selected as the operator for the drilling work.

The drilling campaign is intended to identify geological formations suitable for CO2 storage within the designated offshore area. The Metropolitan Area CCS project is designed to capture CO2 from several industrial sources, including the Kimitsu Area of Nippon Steel Corporation’s East Nippon Works and other industries in the Keiyo Industrial Complex, then transport the captured CO2 by pipeline for offshore storage near Kujukuri.

The joint venture is working toward the start of CO2 storage in the early 2030s under the Engineering Design Work for Advanced CCS Projects commissioned by JOGMEC. It said drilling operations would proceed with safety as the priority while studies and engineering work continue for project commercialization, with the understanding and cooperation of local fisheries, community stakeholders, local governments, and related organizations.

The first well, Kujukuri-Oki A, is expected to be drilled in about four months. The second well, Kujukuri-Oki B, is planned around three months later. Target formations include the cap rock of the Ohara Formation within the Kazusa Group, as well as the reservoir and cap rock sections from the Namihana Formation to the Kurotaki Formation.

The first well is expected to reach about 1,900 m below sea level, while the second is planned to extend to about 1,600 m below sea level. Drilling will be carried out with a jack-up drilling barge. After the first well is drilled at a site about 5 km offshore Kujukuri Town, the barge will move to a location about 13 km offshore for the second well.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
MOL secured ClassNK AiP for a 40,000 m3 liquefied CO2 carrier design fitted with three Wind Challenger units, developed with Samsung Heavy Industries Co., Ltd. for cross-border CO2 transport.
Purpose-built CO2 carriers are moving into service as CCS projects expand in Europe and Japan. Northern Phoenix, Carbon Destroyer 1, and new Japanese vessel concepts show how the segment is developing to support offshore CO2 storage.
Yinson Production has started the CCS unit on FPSO Agogo, marking a milestone for offshore post-combustion CO2 capture at the Agogo Integrated West Hub offshore Angola.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com