Search
Close this search box

Vastwin Sets 15,300t Record in China with Offshore SPMT Roll-On

Vastwin completed a 15,300 t offshore module SPMT roll-on — according to Vastwin, the first operation above 15,000 t and China’s largest single-module project.
Vastwin SPMT rolling a 15,300 t offshore module before loading onto Boskalis Black Marli
Vastwin performs 15,300 t SPMT roll-on and Float-on transfer onto Boskalis’ Black Marlin (Photo: Vastwin)

SHARE ARTICLE

Vastwin (CSL-Vastwin) has completed the roll-on of a 15,300 t offshore platform module — according to Vastwin, China’s first SPMT operation exceeding 15,000 t and the largest single-module SPMT project ever conducted in the country.

The operation involved 500 axle lines and 20 PPUs, enabling safe and precise loading of a 120 m × 78 m × 36 m module. From front-end engineering design through to execution, Vastwin’s team worked with the client to integrate a unified SPMT roll-on plan, replacing segmented lifting and shortening construction duration.

Despite technical challenges, Vastwin ensured smooth execution through detailed simulation, coordinated resource planning, and real-time monitoring. The operation demonstrated close alignment between design, planning, and field performance, confirming procedural reliability throughout.

Following the roll-on operation, the 15,300 t module was transferred onto Boskalis’ semi-submersible vessel Black Marlin using the Float-on/Float-off method for onward transport.

This project sets a new benchmark for China’s heavy transport industry and reinforces Vastwin’s leadership in offshore, modular, and port logistics.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Seaway Falcon has transported PV DRILLING X from Namibia to Vietnam, completing a 7,261-nautical-mile voyage. The jack-up rig will undergo further recommissioning ahead of planned commercial operations in Q2 2027.
Source: Flying Fox Media
Dongbang Giant No. 3 has arrived at Australia's Port of Dampier carrying the final modules for Perdaman's Ceres Urea Project, completing the marine deliveries reported in the latest project update.
Three power generation components weighing up to 335 tonnes were transported to Ireland, with Terra Marique using specially engineered ramps and SPMTs to discharge cargo at a tidal beach landing site.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com