
Final Turbine Installed at Yeu-Noirmoutier Wind Farm
OW Ocean Winds has completed the final turbine installation at the 500 MW Yeu-Noirmoutier offshore wind farm, bringing its first French project into full operation.

OW Ocean Winds has completed the final turbine installation at the 500 MW Yeu-Noirmoutier offshore wind farm, bringing its first French project into full operation.

Excerpt
Sunrise Wind has installed its first turbine offshore New York, keeping the 924 MW project on track for first power later this year and full operations in 2027.

DENZAI and Vestas signed an MoU to combine heavy-lift engineering, crane planning and turbine installation support for offshore wind projects in Japan.

Cadeler completed installation of 66 Siemens Gamesa SG 14-236 turbines at Ørsted’s Changhua 2b/4 offshore wind projects in Taiwan, using the M-class vessel Wind Maker for a 920 MW buildout.

DENZAI Group and PC1 Group have entered into a partnership on renewables and infrastructure in Southeast Asia, starting with the 58.5 MW Camarines Sur onshore wind project on Luzon in the Philippines.

A new anchor-free installation method for offshore wind turbines uses tugboats instead of costly WTIVs and heavy-lift cranes. The method promises reduced costs, faster installation, and better flexibility.

Cadeler has signed two firm offshore wind transportation and installation contracts worth approximately €500 million, covering full-scope foundation and turbine work for a future wind farm.

Cadeler has signed a firm contract with Ocean Winds to install 26 Siemens Gamesa 14 MW turbines at Poland’s BC-Wind offshore project in the Baltic Sea.
For general inquiries and to contact us,
please email: info@hmt-news.com