
ExxonMobil Halts Liza Unity FPSO Production After Guyana Fire
ExxonMobil halted production at the Liza Unity FPSO in Guyana’s Stabroek block after a small fire. Oil and gas operations will restart after required checks are completed.

ExxonMobil halted production at the Liza Unity FPSO in Guyana’s Stabroek block after a small fire. Oil and gas operations will restart after required checks are completed.

MODEC’s FPSO Errea Wittu has arrived in Guyana, marking the company’s first FPSO in the country. MODEC will also provide operations and maintenance services for the vessel.

ExxonMobil has proposed a 35-well exploration and appraisal drilling campaign in Guyana’s Stabroek block, with operations planned from 2028 through 2033.

ExxonMobil Guyana Limited is continuing development drilling at the Uaru Project’s UA_4P04 drill center offshore Guyana, with the MODU Noble Tom Madden scheduled to remain on location until 30 April 2026.

Jumbo Offshore has completed suction anchor installation and mooring line pre-lay for the FPSO Errea Wittu at Uaru Field, Stabroek Block, Offshore Guyana, on behalf of Modec.

DOF Group ASA has won a turnkey contract from MODEC Guyana Inc. to execute mooring pre-lay work for the Hammerhead FPSO offshore Guyana, using Skandi Implementer and Skandi Skansen in a Q2–Q3 2027 campaign.

Saipem has received authorization from ExxonMobil Guyana to execute the Hammerhead offshore project, marking its sixth major contract in the country’s Stabroek Block.

ExxonMobil has approved the $6.8 billion Hammerhead offshore project in Guyana, boosting production capacity to 1.5 million barrels per day by 2029.
For general inquiries and to contact us,
please email: info@hmt-news.com