
NKT Completes First Cable Pull-Ins for €3.1 Billion Biscay Gulf Interconnector
NKT has brought the first Biscay Gulf Interconnector cables ashore at Lemóniz using NKT Victoria and a drilled route extending more than 1,000 m.

NKT has brought the first Biscay Gulf Interconnector cables ashore at Lemóniz using NKT Victoria and a drilled route extending more than 1,000 m.

VARD’s NKT Eleonora has arrived at Vard Brattvaag for final outfitting and commissioning. The cable-laying vessel is scheduled for delivery in Q1/Q2 2027.

NKT Eleonora has departed VARD Shipyards Romania in Tulcea for VARD Brattvaag in Norway, where the cable-laying vessel will enter its next construction phase.

NKT has launched the hull of NKT Eleonora at Vard’s Tulcea yard in Romania, moving the 23,000-tonne cable laying vessel into outfitting as offshore wind installation demand stays firm in Europe.

VARD has completed towing the aftship of hull 969 for NKT from Brăila to Tulcea, advancing assembly of a 23,000-tonne next-generation offshore cable-laying vessel equipped with dual-fuel engines.
For general inquiries and to contact us,
please email: info@hmt-news.com