
Iv to Design Ostwind 4 Topside for 2 GW Baltic Sea Platform
Drydocks World has selected Iv to design the Ostwind 4 HVDC topside. The 2 GW platform will transmit wind energy more than 110 km from the Baltic Sea to the German mainland.

Drydocks World has selected Iv to design the Ostwind 4 HVDC topside. The 2 GW platform will transmit wind energy more than 110 km from the Baltic Sea to the German mainland.

The OSS Jasmund topside and jacket have completed load-out and are prepared for transportation to the Baltic Sea. The 4,500-ton topside and 72m jacket were built by HSM Offshore Energy and Smulders with support from a tailor-made grillage.
For general inquiries and to contact us,
please email: info@hmt-news.com