
Iv to Design Ostwind 4 Topside for 2 GW Baltic Sea Platform
Drydocks World has selected Iv to design the Ostwind 4 HVDC topside. The 2 GW platform will transmit wind energy more than 110 km from the Baltic Sea to the German mainland.

Drydocks World has selected Iv to design the Ostwind 4 HVDC topside. The 2 GW platform will transmit wind energy more than 110 km from the Baltic Sea to the German mainland.

Drydocks World has launched afloat ALNOKHADA, a new 5,000-tonne floating crane developed with ZPMC Offshore. The project now moves into outfitting and load testing.

Netherlands developer Dixstone has chosen Drydocks World for the EPC conversion of an LNG carrier into the Cap Lopez FSU, supporting Gabon’s FLNG plans and adding about 105 million standard cu ft per day of gas capacity.

Drydocks World has launched the 5,000-tonne floating crane Alnokhada, shifting the project into outfitting ahead of commissioning in Q1 2026. Built by ZPMC Offshore, the crane features 5,000-tonne and 600-tonne hooks for complex offshore, industrial and energy projects.

Seaway7’s semi-submersible vessel FALCON has completed the float-off of the Stella Energy 1 MOPU in Luba after loading the unit in Dubai. The MOPU, recently converted by Drydocks World, is destined for the Sèmè Field offshore Benin.

Drydocks World has completed the EMEM FPSO after a delay of at least seven months, preparing the vessel for deployment to Nigeria’s Okwok oil field in early 2026.
For general inquiries and to contact us,
please email: info@hmt-news.com