
North Sea Wildcat Cleared for March Drilling
Equinor will drill North Sea wildcat 25/7-13 in March 2026 after NOD approval, using COSL Innovator under a rig contract starting Q2 2025.

Equinor will drill North Sea wildcat 25/7-13 in March 2026 after NOD approval, using COSL Innovator under a rig contract starting Q2 2025.

Aker BP says the Valhall PWP wellbay module is in place at Aker Solutions’ Stord yard after transport from Dubai, with integration and testing now progressing ahead of offshore transport.

Aker BP has brought Solveig Phase 2 onstream after completing development drilling. New subsea production wells in the Norwegian Sea are tied back to existing host infrastructure on the NCS.

Norway’s offshore safety regulator Havtil has approved Aker BP’s use of Floatel Superior as a temporary accommodation unit at the Skarv field, supporting offshore manning alongside Floatel Endurance.

Norway’s offshore safety authority Havtil has allowed Aker BP to station Floatel Endurance at the Skarv field in the Norwegian Sea, with additional charters lined up for Yggdrasil in 2026 and FPSO Alvheim in 2029.

Equinor has reported gas and condensate discoveries at the Lofn and Langemann wells in PL1140 near Gudrun and Eirin, adding an estimated 30–110 million barrels that can be tied back to Sleipner infrastructure.

Aker BP has renewed its long-term use of Floatel Endurance for a sequence of offshore developments, including Skarv, Yggdrasil and Alvheim, securing accommodation capacity from 2026 through 2029.

Odfjell Drilling has signed an LOI with an undisclosed client for Deepsea Aberdeen, securing continuous work from late 2026 to Q2 2029. The move strengthens the contractor’s backlog strategy as Equinor options and other fleet discussions continue.

Sarens has completed the 11,500-tonne load-out of the Valhall PWP jacket at Aker Solutions Verdal, Norway, marking a milestone in offshore heavy-lift engineering.
For general inquiries and to contact us,
please email: info@hmt-news.com