Search
Close this search box

Spliethoff Ships Vestas Towers to Baltimore

Spliethoff loaded 45 Vestas wind turbine tower sections in Salvador, Brazil, aboard Donaugracht for delivery to Baltimore under a three-voyage wind cargo program.
Image: Spliethoff

SHARE ARTICLE

Spliethoff has loaded 45 wind turbine tower sections onto the multipurpose vessel Donaugracht at Salvador port in Brazil for delivery to Baltimore, USA.

The shipment is part of a three-voyage program carrying wind energy components from Brazil to the United States. Images released by Captain Van Dijk showed the large tower sections secured on deck and inside the cargo holds during loading operations in Salvador.

The cargo was produced for Vestas, one of the world’s largest wind turbine suppliers. Moving tower sections across the Atlantic requires detailed planning because of their size and lifting needs. Each section must be handled as an individual unit, with separate arrangements for stowage, lashing, and discharge.

The shipment also reflects continued demand for multipurpose and breakbulk vessels linked to renewable energy investment across the Americas. Wind components such as towers, blades, and nacelles are often carried by heavy lift and multipurpose ships because standard container services cannot accommodate their dimensions.

For carriers, this type of cargo is closer to oversized industrial transport than regular freight. A single tower section can take up the space of several containers and requires careful crane coordination during loading.

Baltimore remains an important US gateway for renewable energy cargo, including wind projects along the East Coast. Salvador continues to support Brazil’s exports of industrial and energy-related cargo.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Vestas and EnBW are investigating a blade failure involving a V236-15 turbine at the 960MW He Dreiht offshore wind farm. No injuries occurred, and the site was secured.
Hanwha Ocean has started construction of the 390 MW Shinan Ui Offshore Wind Project in South Korea as developer and lead EPC contractor.
Baltic Power offshore wind project by Northland Power and ORLEN off the Polish coast
Baltic Power has supplied Poland’s first offshore wind electricity to the national grid. The 1.1 GW Northland Power and ORLEN project targets commercial operations in the second half of 2026.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com