Search
Close this search box

COSCO Qidong Completes Quay Expansion

COSCO SHIPPING (Qidong) Offshore has completed the main construction phase of its outfitting quay expansion, adding a 220 m berth and 1,420 m total frontage.

SHARE ARTICLE

COSCO SHIPPING (Qidong) Offshore has completed the main construction phase of its outfitting quay renovation and expansion project in Jiangsu Province, China.

The project passed its final quality inspection on 20 April 2026, confirming that the upgraded facility meets the conditions for handover.

Located at the eastern end of Qidong Shipbuilding Industrial Park, the quay is part of offshore engineering infrastructure on the northern side of the Yangtze River estuary.

The project included the construction of a new 220 m, 300,000-tonne-class outfitting berth. Connected with the existing wharf, the facility now provides a total quay frontage of 1,420 m. Construction began in September 2025 and was completed in about eight months.

Following the handover, COSCO SHIPPING (Qidong) Offshore carried out corrective work based on inspection findings and coordinated the transition from acceptance to commissioning.

The quay has now entered ship outfitting operations. The company said the facility will support its current order backlog, help maintain schedules for key offshore engineering projects, and support competitiveness in the high-end offshore equipment manufacturing sector.

The Asset Management Department is also advancing specialized acceptance inspections and filing the final acceptance report to ensure compliance requirements are met as operations begin.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Aibel will assign around 250 employees in Asker, supported from Haugesund, to the study, with completion expected in late 2027. An exclusive EPma option is included; fabrication will be awarded later.
COOEC has begun hull assembly for the Kaiping cylindrical FPSO in Qingdao. The 182-section hull will form the central production and storage facility for a major deepwater oilfield development in the South China Sea.
AL FANAR is the sixth vessel in MOL’s seven-ship order from 2022. Six further carriers under long-term QatarEnergy charters will bring MOL’s participation in the fleet expansion programme to 13 vessels.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com