
Inch Cape Offshore Wind Farm Receives First XXL Monopiles at Port of Leith
The first XXL monopiles for Scotland’s Inch Cape Offshore Wind Farm have arrived at the Port of Leith, marking a key step in the 1.1 GW project’s construction phase.

The first XXL monopiles for Scotland’s Inch Cape Offshore Wind Farm have arrived at the Port of Leith, marking a key step in the 1.1 GW project’s construction phase.

Wagenborg successfully executed a complex RoRo operation to transport a 3,000-ton lock gate from Emden to Eemshaven,.

BigLift’s heavy load carrier BIGLIFT BARENTSZ is transporting the Perenco jackup KOMBI 2 from North Sea Port to Port Gentil, Gabon.

The Indian Register of Shipping (IRS) has confirmed the delivery of the deck cargo ship HAITENG 007, built at Qidong Jisheng Shipbuilding Co., Ltd. in China and sailing under the Panama flag.

DAKO Worldwide Transport GmbH managed the international transport of 10,000 tons of mining equipment from Europe, Asia, and Australia, involving multimodal coordination and infrastructure planning.

COSCO SHIPPING Specialized’s DP2 semi-submersible vessel XIANG TAI KOU has arrived at Leith, UK, with wind turbine monopiles for North Sea projects.

Berard successfully completed the transport and loading of a 2,160-ton, 300-foot barge in South Louisiana using 72 axle lines of SPMTs.

Port Oostende coordinated the assembly and shipment of two cranes from Vigan Engineering to Benghazi, Libya, through its REBO Terminal facilities.

BOA Offshore shared the availability of BOABARGE 38 in Rotterdam this October, offering advanced semi-submersible heavy transport capabilities.
For general inquiries and to contact us,
please email: info@hmt-news.com