Search
Close this search box

Azerbaijan Designates 711.4 Sq Km Caspian Area for Offshore Wind

Azerbaijan has designated a 711.4-square-kilometre area of the Caspian Sea for offshore wind farms and assigned producer selection to the Ministry of Energy.
Image source: Shutterstock / ID-2196581319

SHARE ARTICLE

Azerbaijan’s Cabinet of Ministers has designated a 711.4-square-kilometre water area in the country’s section of the Caspian Sea as a renewable energy area for offshore wind development.

The designation is intended to support more efficient use of renewable energy potential for electricity generation through the construction of offshore wind farms.

Azerbaijan’s Ministry of Energy has been tasked with organising the selection of an electricity producer for the designated area.

The selection process must comply with the rules for choosing electricity producers in renewable energy areas, approved under Presidential Decree No. 2285 dated 2 August 2023.

Construction permits for wind farms within the 711.4-square-kilometre area must be obtained in accordance with Azerbaijan’s Urban Planning and Construction Code and within the period specified in Article 6.7 of the Law on the Use of Renewable Energy Sources in Electricity Generation.

The State Committee on Urban Planning and Architecture must inform the Cabinet of Ministers within three days after a construction permit is granted. If a permit is not issued within the prescribed period, the committee must provide notification within three days after that period ends.

Responsibility for overseeing implementation of the decision has been assigned to the Agrarian and Ecology Department of the Cabinet of Ministers Office.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
South Korea’s 390MW Sinan-Ui offshore wind project is under scrutiny over a projected 29.6% capacity factor and public support that could reach 7.9 trillion won.
EnBW has installed all 64 Vestas turbines at the 960 MW He Dreiht offshore wind farm in Germany, with further commissioning planned before full operation in late summer.
Cadeler has acquired Menck at an agreed EUR 501 million enterprise valuation, adding specialist offshore foundation installation equipment and engineering capabilities to its offshore wind T&I business.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com