Search
Close this search box

Norway backs Emerald Nuclear’s maritime propulsion pilot with NOK 20m

The MarNuPS pilot plans full-scale integrated system testing in Norway in 2027 using electric heating instead of a nuclear reactor, with Island Offshore targeting its first vessel deployment in 2031–2032.
Image source: VARD

SHARE ARTICLE

Emerald Nuclear Norway has secured NOK 20 million in funding from the Research Council of Norway for its Marine Nuclear Propulsion System (MarNuPS) Pilot, which aims to develop and test an integrated nuclear propulsion system for offshore vessels.

The award was included in the Research Council’s funding results published on 23 September 2026. The first phase of the programme is estimated to cost approximately NOK 150 million, with participating companies contributing additional funding.

The project brings together Emerald Nuclear, offshore vessel operator Island Offshore, shipbuilder VARD Group, Vard Electro, the Norwegian University of Science and Technology (NTNU), Imperial College London and Maskindynamikk.

The system is based on Emerald Nuclear‘s 5 MWe Gem Microreactor technology, integrated with energy storage, power conversion, automation and vessel control systems.

A full-scale integrated test is planned for 2027 at Stette, near Ålesund, Norway. Instead of using an operating nuclear reactor, the facility will employ electric heating to simulate the reactor’s thermal output, allowing the partners to evaluate system performance before further development and qualification.

Island Offshore aims to become the first shipowner to install the proposed reactor and energy system, targeting initial vessel deployment in 2031–2032.

The project builds on earlier Norwegian research into nuclear-powered offshore vessels, including the NuProShip II vessel design study undertaken by VARD.

According to the Research Council of Norway’s official funding results, the NOK 20 million award supports the MarNuPS pilot led by Emerald Nuclear Norway.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Prysmian’s 192.8-metre Alessandro Volta has three cable carousels with a combined capacity of 19,000 tonnes and is designed to lay power cables in waters up to 1,500 metres deep.
Island Offshore's second hybrid ocean energy construction vessel will undergo outfitting and commissioning at Vard Langsten following hull construction in Romania, with delivery scheduled for March 2027.
VARD has opened a new design and engineering office in Ho Chi Minh City and plans to expand its multidisciplinary Vietnam-based team to more than 40 engineers.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com