Search
Close this search box

Three injured in UHL Freedom North Sea incident

Two of UHL Freedom’s 25 crew were flown ashore for hospital treatment. Dutch and German rescue vessels responded as engine trouble restricted the heavy-lift ship’s manoeuvring in force nine winds.
UHL Freedom (Source: Marinetraffic)

SHARE ARTICLE

The UHL Freedom North Sea incident on 25 October 2026 left three crew injured, with two evacuated by helicopter for hospital treatment. The heavy-lift ship, registered in Portugal, developed engine trouble during a storm and subsequently recovered only partial engine power.

A rescue helicopter brought the two casualties to Groningen Airport Eelde. Ambulances completed their journey to hospital. A nurse had also been winched down to provide care aboard the vessel, which carried 25 crew. The supplied reports gave no details of the injuries or the third casualty’s condition.

Breakbulk News reported that the Netherlands Coastguard reduced its casualty count from five to three in an update issued at 16:55 local time.

Before propulsion problems arose, the 150-metre ship had been at anchor some 29 kilometres to the north of Schiermonnikoog. Its anchor started to drag, and the crew began lifting it. Engine problems then restricted the ship’s ability to manoeuvre. Heavy seas caused severe rolling as it drifted in Beaufort force nine winds.

The coastguard received a distress call just before 14:00. Rescue boats responded from the Dutch stations at Ameland, Eemshaven and Schiermonnikoog, while Germany’s maritime rescue service dispatched Hamburg from Borkum. An aircraft from the coastguard also joined the response.

The response also included dispatching two emergency tugs: Guardian from the Netherlands and Germany’s Nordic.

The coastguard later reported a partial recovery of propulsion. UHL Freedom had sailed from Bremerhaven on 24 October with Emden as its destination. The owner was responsible for deciding which port the ship would use.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Tender Round 14 seeks an owner and operator for Hornsea 3’s grid connection, with inflation-linked revenue available for up to 25 years, conditional on asset availability and performance.
Jackdaw's four-well platform connects to Shearwater through a subsea pipeline. Its jacket, topsides and pipeline are installed, and drilling was completed in early 2026, according to Adura.
Geo Ocean IV is collecting seabed elevation, morphology and backscatter data across approximately 218 square kilometres, with completion expected on 30 October 2026 if weather conditions allow.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com