Search
Close this search box

Transocean Deepwater Atlas Starts Second Monument Well in US Gulf

Transocean’s Deepwater Atlas has started drilling the second development and production well at the Monument project in the US Gulf of Mexico.
Image credit: Transocean

SHARE ARTICLE

Transocean’s drillship Deepwater Atlas has started drilling the second development and production well at the Monument project in the US Gulf of Mexico.

Navitas Petroleum, a partner in Monument, reported the start of the drilling operation on 8 September 2026. The Deepwater Atlas had arrived at the project location to carry out the work.

The second well follows the first Monument development and production well, which was completed earlier in 2026. Beacon Offshore Energy, the project operator, reported in June that the first well was drilled in Walker Ridge Block 315 and encountered oil-bearing Lower Wilcox reservoirs.

Monument is being developed through two wells connected by subsea infrastructure to the Shenandoah floating production system. Beacon Offshore Energy, Navitas Petroleum and Talos Energy are partners in the development.

According to Navitas Petroleum, it holds a 28.57% working interest in Monument and has 32 MMBOE of 2P reserves attributable to its interest. The company expects first oil from the project by the end of 2026.

The Shenandoah floating production system is being expanded from 100,000 BOPD to 120,000 BOPD to accommodate production from Monument, according to Navitas Petroleum.

Beacon Offshore Energy previously said drilling of the second Monument development well would be followed by completion operations on the first two wells.

The Deepwater Atlas is classified by Transocean as an ultra-deepwater drillship. The rig is designed for operations in water depths of up to 3,658 m.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
COSL Promoter will drill wellbore 33/9-F-4 DH with its target in licence 1214 and its wellhead in licence 037. Equinor operates the target licence alongside Petoro, OKEA and Vår Energi.
The SV-2X campaign includes 38–40 firm drilling days and options for testing and a sidetrack. Idemitsu also contracted PVD Offshore and PVD Logging for support services ahead of the planned 2027 start.
BW Energy reported no damage to MaBoMo or its equipment and no harmful discharge from the facility in its 25 October statement on the rig accident. The announcement gave no date for production to resume.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com