Search
Close this search box

Kongsberg Maritime to Equip Two Cadeler T-Class WTIVs

Kongsberg Maritime will supply integrated electrical, automation and propulsion systems for two new Cadeler T-class WTIVs scheduled for delivery in 2030 and 2031.
Photo: Kongsberg Maritime via LinkedIn

SHARE ARTICLE

Kongsberg Maritime has secured a contract from COSCO Shipping (Qidong) Offshore Co., Ltd. to supply integrated technology packages for two new T-class wind turbine installation vessels being built for Cadeler.

The vessels are scheduled for delivery in 2030 and 2031. Cadeler announced the two newbuilds in August 2026 as part of its fleet expansion for future offshore wind installation work.

Under the contract, Kongsberg Maritime will provide electrical, automation and propulsion systems for both vessels. The package includes azimuth and tunnel thrusters, dynamic positioning technology, power generation and distribution systems, propulsion drives, vessel automation and control systems, and energy management equipment.

The integrated systems are intended to support operational control, vessel positioning and energy efficiency during offshore installation work.

The T-class vessels are intended for offshore wind projects involving larger next-generation turbines and foundations.

Kongsberg Maritime will work with COSCO Shipping Offshore through the design, engineering and delivery stages of the two newbuilds.

The contract continues previous cooperation between Kongsberg Maritime, Cadeler and COSCO Shipping Offshore on offshore wind vessel projects.

Lisa Edvardsen Haugan, President and CEO of Kongsberg Maritime, said the contract continues the company’s cooperation with Cadeler and COSCO Shipping Offshore, while addressing requirements for operational performance, energy management and vessel positioning.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
Pioneering Spirit used its jacket lift system to install both suction bucket foundations and topsides in shallow water for 50Hertz’s OST-6-1 connection, completing the work in one offshore campaign.
Dogger Bank A has secured an eight-month extension to the CfD start date for its first 300 MW contract tranche. The revised July 2027 deadline follows turbine blade failures and additional repair requirements.
Sven Utermöhlen brings 20 years of offshore wind experience to Esvagt. RWE’s succession announcement also provided for him to advise its offshore wind business for six to twelve months after his departure.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com