Search
Close this search box

Seacontractors’ SEA BANCKERT Tows Heerema Jacket from Vlissingen

Seacontractors’ SEA BANCKERT departed Vlissingen East on 30 August 2026, towing a Heerema jacket into the North Sea in support of offshore operations.
Photo credit: Seacontractors

SHARE ARTICLE

Seacontractors deployed its AHTS SEA BANCKERT to tow a Heerema jacket from Vlissingen East in the Netherlands on 30 August 2026.

The vessel left Vlissingen East with the offshore structure in tow and headed into the North Sea. Seacontractors said the operation was supporting Heerema offshore activities.

North Sea Port records show that SEA BANCKERT, IMO 9388651, departed the port area at 14:42 on 30 August. The port data identifies the vessel as Dutch-flagged and records its length as 73.2 m.

According to the vessel specification published by Seacontractors, SEA BANCKERT is a 2009-built AHTS with DPS-2 capability and a bollard pull of 175 tonnes. The specification lists the vessel at 73.2 m in length and 16.4 m in breadth, with 13,678 BHP of brake horsepower.

SEA BANCKERT was added to the Seacontractors fleet following the acquisition of two AHTS vessels from DOF Group in 2025. The vessels were subsequently named SEA BANCKERT and SEA EVERTSEN and transferred to the Dutch flag.

The two AHTS vessels expanded the company’s capacity for anchor handling and towing operations, with SEA BANCKERT now deployed on the Heerema jacket tow from Vlissingen East.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
DOF has secured a T&I contract for a North Sea floating offshore wind development covering inshore marine work, mooring pre-lay, FOWT installation and export cable installation.
Heerema Fabrication Group has completed the first roll-up for the IJmuiden Ver Beta 2GW jacket in Vlissingen, lifting a 1,700-tonne steel section into an upright position.
Jan De Nul will take part in its first CCS project, using Simon Stevin to install protective rock over a North Sea CO₂ pipeline for the Northern Endurance Project.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com