Search
Close this search box

VIDEO: Woodside Reports 5,000-Tonne Module Installation on Tlaloc FPU

Modules weighing around 5,000 tonnes each have been installed on the 45,000-tonne Tlaloc FPU under construction in South Korea for the Trion project.
Image source: Woodside Energy

SHARE ARTICLE

Modules weighing around 5,000 tonnes each have been installed on the Tlaloc floating production unit under construction in South Korea for the Trion project.

The lifting work took place at HD Hyundai Heavy Industries, where the 45,000-tonne FPU is being built.

Woodside Energy said the installation followed months of planning and coordination across multiple crews.

The Tlaloc, named after the Aztec rain god, is being constructed as Trion targets first oil in 2028.

Editorial Note:
This article was prepared with the assistance of AI tools to enhance clarity and efficiency.
All information has been reviewed and verified by the HMT News editor.
HD Hyundai Heavy Industries Gunsan shipyard in South Korea
A subcontractor died in an equipment accident at HD Hyundai Heavy Industries’ Gunsan Shipyard. Authorities are investigating the incident, while panel factory assembly lines remain suspended.
Altera Infrastructure’s FPSO business has completed its acquisition by Carlyle and begun operating independently under the Altera brand, led by chief executive officer Chris Brett.
Sarens is preparing 560 SPMT axle lines and 24 PPUs for the July 2026 load-out of the 17,666 t Valhall PWP topside in Stord after module operations across Norway.

Subscribe to HMT WEEKLY

Receive HMT WEEKLY in your mailbox.

Heavy Marine Transport News, Delivered Daily — Stay informed on shipping, offshore, and global logistics.

SECTION

INFORMATION

CONTACT

For general inquiries and to contact us,
please email: info@hmt-news.com